2024 ANNUAL REPORT • 5 Fort Ord Regional Trail and Greenway The vision for the FORTAG project is to create a safe pedestrian and bicycle corridor designated to accommodate people of all ages and abilities. There are three segments of the trail currently progressing. Construction of the Canyon Del Rey Segment in Del Rey Oaks began in August and is expected to last through August 2026. The California Ave segment in Marina is at 60% design, with construction expected to start in 2026. In alignment with all of this, we continue to work with the Federal Highway Administration and their design team to finalize the segment that runs from the California Ave segment to the Jerry Smith Trailhead of the Fort Ord National Monument. US 101 South of Salinas Increased numbers of injury and fatality collisions has led Caltrans to initiate closing the at-grade left hand turns along US 101 between Salinas and Chualar. The project team is working on identifying feasible long-term options that will reduce travel circulation impacts these closures will have on the Chualar community and the residents and businesses along this critical highway corridor. The environmental evaluation for the long-term options recently started and is scheduled to be completed in 2026, with final design by the end of 2027.

RkJQdWJsaXNoZXIy MjAzNjQ1NQ==